What steps are required during the installation of the cement tile machine?
Board installation and commissioning: board and machine axis consistent with the plane of the plane and the plane on the plane in the same plane, and the vibration table to maintain a certain distance to ensure that the pallet smooth from the vibration table to the delivery Board machine chain, for the
Feeder installation: adjust the plane of the plate on the plate by the position shown in the figure. The plane of the shaking table is in a plane, and the board is aligned with the main axis to adjust the distance between the boarding machine and the vibration platform. Pallets in the transport when the smooth fall in the middle of the shaking table, the debug board will be connected to the host board and fixed.
Hydraulic station installation: the hydraulic station on the left side of the host 1.5 meters (from front to back), the tubing must be tightened, the cooler connected to the cooling water.
Board installation and commissioning: the board and the plate machine board axis, along the axis direction adjustment board machine so that the board machine in the hanging board down when the tray does not collide with the board, adjust the board lift Induction switch position to determine the number of yards of brick, up to no more than 3 board.
Host installation: the user in accordance with the size of the foundation map dug the foundation, according to the requirements of the drawings for the foot of the embedded hole or under the embedded iron with concrete pouring, for the installation of embedded holes into the anchor bolts (M24 × 360) and then Grouting, embedded iron can be a one-time cast into the installation and direct welding with the host, based on the plane must be level, the smaller the better the better.