is the elevation of the upper surface of the tower crane foundation flat with the elevation of the bottom of the new building? Or lower than the trough bottom elevation? ThirtyI think this is better. Please specify which specification has the relevant regulations. Which page is it? Thank you very much!
Pouring foundation does not increase the foundation safety first
There is no standard in the tower crane foundation and building foundation, there is no such provisions.In fact, you can do whatever you can. The only factor that can be said is the Design Institute, to see if they agree.Design Institute to consider this problem, generally disagree, you let the two based on the surface flat, because there is a stress concentration problems. It's like a pebble under your mattress. So, in general they will demand based on the surface in the construction of tower crane foundation floor, the middle 30-50cm gap with soil pad.Of course, no matter which of these two methods you have to use the back belt to enclose the tower crane foundation.
When the tower crane is installed in the fertilizer tank, is the elevation of the upper surface of the tower crane foundation flat with the elevation of the bottom of the new building? Or lower than the trough mark