Home > categories > Machinery & Equipment > Drilling Rig > 200 rig footage every day how many meters
Question:

200 rig footage every day how many meters

200 rig footage every day how many meters

Answer:

Footage number and geological conditions, drilling performance, operator proficiency, construction site conditions have a relationship, and to say that footage of the day, and the length of pile pile diameter has a diameter of 1.2 meters, with 60 meters long, 2 meters under the casing 0.5 hours, casing well Party A, the Commissioner General to look at. General situation, the first 20 meters of drilling, probably within 1 hours, 20-40 meters, less than 1.5 hours, 40-60 meters, less than 2 hours.
Footage number and geological conditions, drilling performance, operator proficiency, construction site conditions have a relationship, and to say that footage of the day, and the length of pile pile diameter has a diameter of 1.2 meters, with 60 meters long, 2 meters under the casing 0.5 hours, casing well Party A, the Commissioner General to look at. General situation, the first 20 meters of drilling, probably within 1 hours, 20-40 meters, less than 1.5 hours, 40-60 meters, less than 2 hours. Hope to be of help to you.
What stratum? What about piles? Full sticky mud, 1 meters, 60 meters deep, up to 3 hours a, fastest 2 hours,

Share to: