It's about 10 x 15 feet and also includes a wooden deck.
Call an excavator for an estimate. To clear it out and haul away expect at least $1000, maybe more depending on factors involved.
I run a penal complex in VA and we had an same problem with a clean outdoors freezer that change into laid in part in the floor on a concrete base. It rose 14 inches till contractors got here across out we laid it on precise on an undrground move. i desire that is not your case; we had to desert the unit at it is modern-day placement and ended up growing to be a drainge pond there. there is a few thing causing the pool to enhance upwards, concrete doesn't flow in that way except it is helped. seem into that theory for a lengthy time period. Godspped and sturdy success.