Install the main keel boom: After lifting the high level of the ceiling and the keel position line, determine the height of the lower end of the boom, install the pre-machined boom, and install the boom with the 8mm diameter expansion bolt on the original top surface. Boom selection diameter of 8mm through wire, hanging bar spacing control in the 1200 mm range.
Install the sub keel: According to the specifications of the aluminum slab plate, the installation of the sub-keel with the board, the keel hanging through the hanging hanging on the main keel. When the length of the keel to be a number of continuation of a long time, with the keel connection, hanging in the keel at the same time, will be connected to the opposite end, and the first straight after the fixed. Installation of metal plate: aluminum plate installed in the middle of the assembly area in the vertical direction of the keel direction to pull a baseline, alignment of the baseline to both sides of the installation. Installation, gently, must be along the flanging part of the side of the square on both sides of the light pressure, the card into the keel and then push. With the keel of the keel, you can in the matching of the main keel and hanging bars connected to the fixed, directly to the board to install up. Clean: aluminum plate installed after the need to use the cloth to wipe all the board clean, no dirt and fingerprints, etc.
Installation of the side keel: according to the high requirements of smallpox around the wall with cement nails (or drilling with the impact of drilling) fixed edge keel, cement nail spacing of not more than 300 mm.
Installation of the main bone: the main keel generally use C38 light steel keel or with the support of the main keel, spacing control in the 1200 mm range. Installation with the main keel supporting the hanging pieces and boom connection.
in the room around the wall to play a good level, according to the design elevation, the horizontal line as the benchmark to determine the elevation of the ceiling and line of the line, to find the center of the room, and along the ceiling elevation line to the center of the room as the center Draw a keel on the wall.