Question:

EPDM rubber flooring installation construction what are the precautions

nan

Answer:

Drainage slope is 1:100, and the drainage and water outlet; part of material leveling, defoaming and sealing, the tools are: with fetters of sub rake, putty, Aluminum Alloy scraper.
The concrete can not contain any additives or hardening agent; rut, induration, concave, crack, or openings and other phenomena may not appear on the site.Water, water circle, the ingredients, mixing site clean up, pay attention to keep the ingredients and the surrounding smooth clean ground. Taiwan said the burden of ingredients, mixing barrels, mixers, barrels board, pliers, etc.. Each part should be in strict accordance with the mixing of raw materials. 3, the concrete must be wet through 7 days, the 28 day of emotional maintenance treatment;
EPDM rubber floor construction foundation and installation precautions generally pay attention to the following requirements:1, concrete forming a surface to be rough processing; plastic pitch cement basic need maintenance 15 days above, complete infrastructure, the need for light pressure plastic pitch surface galling.

Share to: