Generally do cabinets, wardrobe process
According to the requirements of customers and cabinets and kitchen equipment configuration, preliminary design, determine the water potential, the warm water separator, terminal water purification device, food waste disintegrator, disinfection cabinet, oven, dishwasher, microwave oven, cooker, lampblack machine, switch, socket, water, gas boiler, flue check valve solar energy, water tank, gas alarm, tank size, height, body material, cabinet board, mesa material, water retaining height, wall tile or glass paint, position, flue gas meter, manhole or smallpox pipe Lane manhole etc.;
First by the furniture designer to house in the cabinet, closet size, and then painting the furniture layout; when you can determine the drawings, materials and furniture hardware accessories to make specific requirements, then furniture quotation, can make furniture when the above steps are determined.
According to the on-site review of the size of the wardrobe, determine the cabinet material, door style, cabinet equipped with induction light source, storage system, hanger tie rack, drawers, storage case, mirror inside or installed, selection of hardware accessories. Usually cabinets, wardrobe orders to the installation, to 20~30 days cycle.