Home > categories > Hydraulic & Pneumatic > Check Valve > How to install the kitchen flue check valve?
Question:

How to install the kitchen flue check valve?

How to install the kitchen flue check valve?

Answer:

First, we should pay attention to the direction of check valve opening, open the location to smoke pipe opposite;Second, we should pay attention to check valve and common flue or after the installation of household flue sealing point, if the conditions are called thick putty plugging;Third, after the check valve is installed and fixed, the smoke exhaust pipe should be tightly packed with the check valve.Remark: when choosing check valve, choose a brand with better sealing effect, such as submarine.
To see what the pipeline, the installation of the location of pipe drilling (Professional) wall pipe, according to the back valve installation size, with percussion drilling, with expansion bolts fixed. The calcium carbonate pipeline is directly fixed with screws (hardness is better)
1, vertical transport, the flue should take protective measures, and must be two lifting.2. Locate the center line of the flue position. In the reserved hole, draw down four vertical central lines from the roof, and draw 2 orthogonal central lines on the floor plane.3, the flue to the scene, the first flue hanging to the roof, surrounded by the center line of pop in the flue, and the flue of the reserved hole slowly down the electric hoist, from top to bottom layer installed flue in place, the center line correction. The center line of the flue and the center line of the reserved hole should be less than 1cm, the deviation of the centerline of the upper and lower flue is not greater than 1cm, and each flue must be guaranteed vertically and vertically.4, the installation of flue should each layer as bearing, bearing steel 2 root diameter over 14mm?.5. After the flue is installed, install the check valve hole at each flueFire type flue check valveFirst, stir the cement with a special glue, coat the edges of the check valve, and then install it at the opening of the check valve.6, the construction should be reserved at all levels of the hole, covered with a cover plate, to ensure safety in construction, to prevent construction waste fall into the flue.7, the flue is thin-walled components, in handling and installation should be gently handle, not to impact, not in the pipeline to pile other heavy objects and walking.8, the roof flue should be in the roof insulation layer, fire layer before construction. 9, the use of gas water heater exhaust system is strictly prohibited.

Share to: