How to remove reinforced concrete
Before calculating the weight of the cutting block to meet the load requirements of lifting equipment, a reasonable layout block.
(2) the layout process must consider the lifting capacity of lifting equipment.
(1) According to the construction drawings and site entities of the survey, the technical staff need to be cut out of the concrete entity design and layout, the entity stratification, block excision.
(2) in the cutting area around the orderly organization of drainage, to prevent the construction of water pollution of the surrounding environment.
In the process of cutting cold water with the cutting equipment itself to cool and avoid the role of dust.