Is the installation procedure of boiler water softener tedious? How to install
Generally one hundred or two hundred tons or less capacity, two people can connect all day. The main body is in place difficult, if it is below ten tons of capacity, very easy.
Two 、 controller installation and resin filling (using resin: 001 * 7 strong acid cation exchange resin)A, before filling, the central pipe (water distributor) should be placed in the middle of the resin tank, lower than the tank mouth 0.5mm, cut and guide the angle (at this time, use adhesive tape to seal the lifting nozzle, and the resin will enter the central pipe);B, the processed resin will be put into the resin tank around the central pipe according to the required loading capacity.C the above operation shall keep the central pipe in the middle of the resin tank mouth.D, remove the sealing tape from the center pipe.E, installation of water distributor, the controller socket on the center tube, carefully in a clockwise direction control valve, (Note: make sure the center pipe is inserted into the valve control valve, control valve in the tank) until the screw on the interface.
Put in the center, and the sides are the resin cans. After placing, it is to connect the water inlet and outlet pipe.
Not fussy. Now, the boiler water softener is a multi-channel valve, integrated. Water softener is usually a one use, salt box is a trailer two
The A and water tank shall be installed on a firm cement platform and shall be provided with a drainage ditch nearby;B, salt should be placed near the resin tank, and try to shorten the length of the tube suction salt;When the water softener and the heating device are connected directly, the pipe section 3 meters or more shall be kept and the check valve shall be installed on the c;D, it is easy to supplement the regeneration agent;E, the equipment should be left in the vicinity of operation and maintenance space.