Home > categories > Construction & Real Estate > Form Traveler > Management measures of hanging basket
Question:

Management measures of hanging basket

nan

Answer:

12.3. fence. In the hanging basket around the set of sealed guardrail, to prevent high-altitude operation, object tools fall wounding.12.4. body tie. The construction of the box beam is placed on the river, and the height is 8. 15 meters, in case of safety requirements for the construction of high-level personnel, tied to the waist belt.12.5, avoid the wind. When the wind up to 7 or more, the hanging basket construction must stop operation, 012.6. lamp. Due to the duration of the project is tight, almost two days and nights of continuous bridge shift work, night construction site must be equipped with adequate lighting to ensure the safety of construction personnel.
12.1. re education. In the hanging basket construction, pay close attention to all the technical personnel of the technical disclosure and security. Everyone pays attention to safety management. Safety education 1 security inspection system form 012.2. hat. Hanging on the construction site, the line of life and safety, safety and happiness linked to two banners. And hanging into the site must wear helmets warning signs 0
The 3#~10# box girder of the bridge is hanging up and down vertically, so the safety management is more important. In the implementation of safety management, focus on the following work:

Share to: