Shandong 03 fixed ventilation pipe flange production, installation, how to take charge?
Two, work content:1, the wind pipe installation: with the reserved holes, wind pipe, elbow, three links, reducing pipe, pipe fittings, flanges and other Tianyuandifang reinforcement frame, hanging bracket mounting, derusting, painting wind pipe and steel.- according to the above description, flange manufacture and installation has been included in the amount of wind control stability.The ninth chapter of stainless steel plate and components production and installation of ventilation pipeFirst, this chapter includes stainless steel plate, wind pipe, tuyere, flange, hanging support bracket production and installation, a total of four sections, 9 items.Six, wind pipe fittings including the fabrication and installation project, but does not include the flange and the hanging bracket and the hanging bracket; flange according to this chapter separately calculated the corresponding project.- fixed number: 9-527, 9-528The tenth chapter aluminum ventilation pipes and parts installationFirst, this chapter includes aluminum circular duct, rectangular duct, round cowl, flange manufacture and installation, a total of four 20 items.Four, wind pipe production and installation projects include pipe fittings, but not including flanges and hanging support bracket; flange production and installation in accordance with the corresponding items in this chapter.
The first chapter of the corresponding item to support.- fixed number: 9-546~749The eleventh chapter plastic ventilation pipe and components production and installationFour, the wind pipe production and installation projects include pipe fittings, flanges, reinforcement box, but does not include hanging support bracket, hanging support bracket, using the first chapter of the stent project.- fixed number: 9-590 interface and flexible expansion joint flange9-589 flexible interface and expansion joint without flange (pay attention to the difference between two quotas)The twelfth chapter of glass steel ventilation ducts and parts installationThree, glass steel ventilation pipe installation project, including three links, elbow, tube, pipe fittings and Tianyuandifang installation flange reinforced frame and the hanging bracket installation, not including the cross wind landing bracket. The landing bracket shall be calculated in accordance with the first chapter of the support project.- according to the above description, flange manufacture and installation has been included in the amount of wind control stability.
There are five chapters in the consumption quota of installation engineering in Shandong Province, including 1, 9, 10, 11 and 12 chapters. The corresponding categories are thin steel plate, stainless steel plate, aluminum plate, plastic and glass fiber reinforced plastic. Following, in accordance with the instructions in order, followed by instructions.The first chapter of the production and installation of steel sheet gout pipelineFirst, this chapter includes galvanized steel duct, ordinary steel duct, galvanized steel pipe (no flange connection), fan coil bracket accessories, connecting pipe, ventilation pipe production installation and flexible hose installation, a total of seven 30 items.