Solid wood flooring installation need to pay attention to it
Do not understand, to complete the task only
The first floor should be flat. Second, the wall to stay seam 1 to 2 cm.
As the saying goes: "third floor, seven install", so the installation process must pay attention to some 1, the installation of the floor before the ground clean. Especially where there is a "tumor" to eradicate. 2, will be wired, telephone lines, network cable layout. 3, if the wall of the heating tube too thick too deep, it is best to fill with dry sand. Do not let go of dry satin Nao and so on to persuade long slippery to use cement to seal! 4, if there is water pipes, heating pipe transformation must notify the installation of the master, so as to avoid accidents! 5, sprinkle the floor medicine, corner and door to sprinkle more. 6, asked the installation of the master will be under the door saw the saw, so that the floor inserted in the door under the set, so install more solid. 7, paved waterproof mats, if it is geothermal ground, must be used for geothermal mats. 8, before the installation of the best box to open, check the floor surface there is no corner (this situation is very small, but also to prevent). 9, be sure to keep the floor and wall 8mm telescopic space. 10, be sure to let each room into a plate. (At the door off, leaving the telescopic space) if it is a large area, each break 8-10 meters off once. 11, the installation of kicking the angle, the best use of yin and yang angle, because the use of the yin and yang angle, kick the corner joints will be strong. 12, floor and kitchen floor tiles connected with the best copper or stainless steel bar, do not use ordinary plastic strips. 13, before the completion of the installation must be fully accepted once again. Turn my love my home network,