Home > categories > Machinery & Equipment > Cranes > The bridge crane has been tried for several years
Question:

The bridge crane has been tried for several years

The bridge crane has been tried for several years

Answer:

General purpose two years one inspection, suspended molten metal or high temperature for 1 year inspection.
?inspection fees; (the fee is attached to appendix 2) Capture and register information 3, I arrange the inspection plan, inform the unit in advance and agree to the on-site inspection time 4, prepare the relevant information to cooperate with the on-site inspection (see annex 3 for the required information) Five, if exist hidden dangers after inspection need rectification, crane units must be agreed in the special equipment inspection opinion notice before the deadline, the rectification of the treatment will fill in and build official seal of the special equipment inspection opinion notice to quote to me, overdue don't quote as are not corrected, will issue a non-conformance report. 6, the time for the inspection is from Monday to Friday 3:00 p.m. (national holidays will not be accepted). Seven, accept only use unit (use principal responsibility unit) the examination, the other unit agent does not accept.
The bridge crane has been tried for several years

Share to: