Home > categories > Construction & Real Estate > Steel Prop > The construction scheme of the steel pipe support frame
Question:

The construction scheme of the steel pipe support frame

How much space should be filled in the steel pipe support of 70cm thick ground floor?

Answer:

It is important to note that the length of the front beam is usually 1.1 m -1.3 M. The maximum extension shall not exceed 1.7 meters, if the construction needs, the front beamLength of more than 1.3 meters, must take corresponding safety measures, accordingly reduce work load or increase the weight, guarantee of safety against overturning coefficientIn 2(5) the steel wire rope is fixed at one end of the reinforcing steel wire rope and the rolling wheel which is connected with the front beam, and the steel wire rope clamp is tightly screwedThe utility model is characterized in that: the utility model is characterized in that: the utility model is characterized in that: a pin shaft of the small connecting sleeve is arranged on the other end of the steel wire rope, and the closed end of the rope passing through the rigging spiral buckle is fixed with a steel wire rope clamp to adjust the screw of the screw buckle.(6) the working steel wire rope and the safety rope are respectively fixed on the front beam steel wire rope hanging plate according to the above method, and an upper limit block is arranged at the proper place of the safety wire.
This Lida electric basket installation method:(1) the plug rod is inserted into the front bracket casing triangle, according to the parapet height, the height of the bars inserted in the regulation of the range of 1.15-1.75 m, fixed with bolts, complete the front seat installation.(2) insert the inserting rod into the rear bracket, the height of the inserting rod is high, and the inserting rod of the front bracket is high.(3) the front and rear beams are respectively arranged before and after stent insertion within the casing, with the beam to the front and rear beams set, and according to the situation before the selected beamThe distance between the front bracket and the rear bracket should be placed to the maximum, and the upper bracket is placed on the front seat of the inserting rod sleeve. The small connecting sleeve is sheathed on the inserting rod sleeve of the rear bracket and is fixed by bolts.(4) whether or not the installation, the suspension mechanism must meet the anti overturning.
The steel tube support frame is installed on the hanging basket and the common external wall construction and installation basket method. Only in the steel pipe bracket installation basket should pay attention to avoid the steel pipe bracket, to avoid the influence of the steel bracket of the electric basket rise and fall. Thus affecting the normal operation of the electric basket

Share to: