Ready to open a small injection molding plantThere are only two machines at the moment, one 160T, one 250TProducts are note PA, PP, PU round (3, 4, 5 inches through)I would like to help you count, if 2 machines 24 hours boot, a month down, the output value of these 2 machines about how much? Thank you, the best way to calculate ~ ~!
Able to save 1/4 of electricity5 inches with 250T machine to produce, use the mold should be 1 out of 4, cycle count 50 seconds, too specific I don't know how, I just need to calculate method and approximate output value! Because we shipped here, probably a few days 45 to 90 days, I want to see enough money flow! That's the way it is, huh?! --------------------------- know this product with what material, if the PA is up to 30 seconds, you said the other 2 material may be 40 seconds, I didn't see products not determined.
To say the first mock exam number, production cycle. Otherwise, no one will count, ask me questions after adding, and I'll try my best to answer youYou have to pay for the electricity, plus a grill. Mould temperature machine, if use PA material, electricity charge must be more, cycle is so long, install an electric appliance.
Take PA 30 seconds cycle, (because PA is a crystalline material, cooling time is not necessary so long) daily production for 23 hours, one hour maintenance machine, daily production of 3600/30=120*4*23=11040PCS, how to know the quality requirements. How many secrets do you have for a month? The machines are very well maintained and seldom broken.If there is no flash, try to reduce the clamping force. This reduces the machine wear and tear, and if the product requires general, you do the frozen water. The other 2 materials will speed up 10 seconds at least. Don't hesitate to ask me questions