Home > categories > Energy Products > Electricity Generation > Two power equipment; I was engaged in a number of more than a few cabinets to know more about the two
Question:

Two power equipment; I was engaged in a number of more than a few cabinets to know more about the two

1, common measurement and control cabinet, what is the common measurement and control cabinet? What signals are measured? High voltage side (10kV and above) have the corresponding relay protection device, regardless of the panel or on the spot, will not be on the public measurement and control cabinet; the so-called public measurement and control cabinet is measuring what? Low voltage measurement and control? Or what, for example, thank you (power generation, power supply and distribution does not matter, can speak on the line)2, network equipment cabinet, I probably can understand, is from the equipment from various communication signals collected by the communication management unit, the output signal of Ethernet, this cabinet is the main communication management machine and switch is?3, how to locate the remote communication cabinets? What is the main role? What are the main equipment?4, why do we usually need GPS time device, what is the significance? What will happen if there is no?

Answer:

The GPS device is used to synchronize the time of each station in the station, if the time is not synchronized when the failure of the failure of the failure of the report to see the action of each device has a relationship
The network equipment and the remote communication cabinet are responsible for the communication between the equipment and the background in the station and the communication with the electric power department
The common measurement and control cabinet are generally some common control signals such as AC / DC screen, knife position, device power loss and telemetry some voltage and current value, there are no specific remote control, measurement and control device of equipment access to public control