I have a pile machine construction record card, but Supervision said or not, please master pointing.
If there is any nonconformity, the rectification shall be completed and checked by the supervision.
Construction permit and quality assurance certificate, and environmental noise shall comply with the Supervision Certificate
After the site installation of pile driving machine is completed, the testing institution shall be qualified for on-site inspection and issued a certificate of qualification.