Home > categories > Sports & Entertainment > Artificial Grass & Sports Flooring > What is smallpox aluminous gusset plate installation method?
Question:

What is smallpox aluminous gusset plate installation method?

What is smallpox aluminous gusset plate installation method?

Answer:

When properly installed kitchen Lvkou order: first with the flue hood hose fixed, the other end of the range hood select good position to be installed, and the kitchen lights bought used, no need to install. Then Lvkou ceiling. When you need to install large lamps lighting is best to use the wooden keel reinforcement alone, although the choice of ceiling light steel keel easily deformed, but large lamps rather heavy, long hung on the keel keel also make changes.
To complete the combination plate, round left side, the left side for a symmetrical four weeks even, we will arrange a decorated dragon skeleton position line drawn on the upper level line. Main keel hanging point spacing, according to the design recommended selection series, the middle part should bagging, bagging height of not less than the keel surface of the room span of 1/200. After installation of the main keel should be promptly corrected position and height. To control the dragon skeleton formation, should first pull out the elevation control line to the vertical and horizontal, from one end of the beginning, while the installation of the suspension while adjusting boom height. After Omo formation, and then for some curved edge lifting keel single adjustment until smooth line with the requirement. Boom should be straight and have sufficient bearing capacity. When the boom need to take a long, must lap weld, weld full uniform. Rust treatment, the boom from the main keel ends shall not exceed 300mm, otherwise it should be added to the boom, in order to avoid the main keel fall, sub-keel (small keel in the keel or below) should be close to the main keel installation. Full corrected major, minor and horizontal position of the keel. Connections shall dislocation installation, check the installed ceiling frame should be solid and reliable, before the next step of construction to meet the relevant specifications. When installing square Lvkou Ban, should be secondary bone straight. Gusset plate should be smooth, without warping, flat ceiling plane error should not exceed 5mm. Basic is like this.
1, after the installation of various pipelines and equipment inside the ceiling, determine a good position lights, vents and various lighting opening position (a) working conditions. 2, the front cover panel ceiling installation should be finished wall, floor wet work projects. 3, setting the ceiling construction platform shelf. 4, light steel frame ceiling in front of a large area of construction should be done model, the degree of arching ceiling, light tank, Chuanglian, vents, etc. for the construction process, was identified after the large-scale construction. (B) material preparation: aluminum square plate plate, keel, boom and so on. (Iii) construction equipment: Drills shock, no teeth saw, hacksaw, gun, plane, screwdriver, hammer hanging line, angle, hammer, spirit level, line, fountain and so on.

Share to: