What is the construction process of the point glass curtain wall?
First measure whether the steel structure and drawings in line to see if there is no deviation. If there is no deviation in the steel structure on the line to set the location of the mother, the location should be as accurate as possible. And then welding to the mother base. The welding is completed and then the jaw pieces are mounted on the female base, and then the splice fitting is mounted on the hole of the glass, and then the hook is hung up and the screw is tightened. Out of place.
The glass curtain wall is made of skeleton, glass and accessories.
??????? 1, the skeleton is composed of longitudinal columns and crossers, the main role of supporting glass and fixed glass;
??????? 2, the glass is the curtain wall fabric, is the building envelope components, but also architectural decoration, but also the role of glass windows.
??????? 3, the annex is the bolt, aluminum pull nails, nails, sealing materials and connectors.
?????? Glass curtain wall of the process, is the first line, measured the location; and then install the skeleton; the final installation of glass
The curtain wall is the outer wall of the building, is not bearing the weight, just like the curtain hanging. At present, many large and high-rise buildings commonly used in light walls are used this.