First to do the original ground leveling, and then covered with insulation materials, the top of the laying of warm water pipes, and then laying a layer of insulation materials, and then above the mortar leveling
Process: 1, in the case of the ground flat before the first with about 5MM of benzene board will be all the pavement covered with the ground. 2, in the benzene board covered with a layer of insulation film. 3, in the insulation film laying geothermal tube. Here need to pay attention to, every square meter should be laid around the heat pipe 5M can not have any joints. The spacing between tubes and tubes should be appropriate at 20CM. 4, after the completion of geothermal pipe laying on the top of the hourglass (that is, sand sands save things). 5, finally, in the above with about 1: 5 cement mortar leveling. (Absolutely can not be calendering, otherwise affect the cooling effect. I will not say the first brick) Note: 1, geothermal company's choice. Congratulations, hidden projects do not save, we must choose a qualified, strong, good reputation, professional and strong, rich experience in the construction of geothermal companies, signed a formal contract. This is the decisive condition for ensuring the quality of the project. 2, the choice of geothermal pipe. Do not be confused by the low offer, geothermal pipe quality of the good and bad, a direct impact on the life of geothermal engineering, the choice of good quality underground pipe, floor components (including water separator, valves, filters, etc.). Step back, even if the future quality problems, the pipe manufacturers will have some compensation. 3, the choice of the best parts of the ground are all qualified quality copper parts. Geothermal engineering underground part of each road must be a complete tube, can not take any form of connection In fact, after the cement mortar filled with what pipe is not important (but can not use too rubbish). In fact, when the shop is most afraid of heat resistance (air resistance: that white is the tube in the air). So in the shop when the heat, especially immediately before the backfill must let the workers carefully check the good.
General geothermal installation of the construction steps: the first step to heat the first pavement to clean up the ground, pay attention to the corner clean up, to ensure that enough to allow enough expansion joints. The second step in the ground layer of plastic sheeting to isolate the moisture, let the plastic cloth in the four corners were higher than the ground 10cm. The third step to lay the mats. Note that to leave the expansion joints, the interface at least overlap 5cm, and must be sealed with a good tape. Use skirting boards that are thicker than ordinary floors and need to be built independently. After 24 hours of installation, the floor can be heated. In order to facilitate the heat, the cushion material should not be too thick. Common sense: to use geothermal floor special glue; can not shop pads; can not play keel, because this gap will leave the air, air thermal conductivity is low, is not conducive to heat transfer. Floor and floor between the mat can not use ordinary foam mats, be sure to use geothermal paper mats, because this mat heat conduction, no deformation. Ordinary foam mat heat slowly, long-term high temperature conditions, easy to produce harmful gases, endangering the health of users. Whether it is water heat radiation heating or cable heating heating system touch usurped Du Gu Sen Sen single system, do not live in the field on the ground furnace, electric furnace, etc., because the surface temperature is too high, then the ground under the aluminum-plastic composite pipe May melt. Geothermal flooring Due to the specificity of its function and the complexity of geothermal system, compared with ordinary flooring, geothermal floor maintenance and maintenance has its own unique, in the heating and moisturizing to pay special attention.

Share to: