Question:

What is the height of the building material stacking at the construction site? Like red brick, steel, template or something

What is the height of the building material stacking at the construction site? Like red brick, steel, template or something

Answer:

1 steel stacking to reduce the deformation and corrosion of steel
When the open pavement, the piling area should be flat and above the surrounding ground, surrounded by drains, easy to clean after the snow Pile as far as possible to make the steel section of the back or outward, so as not to snow, water 2 When stacked in a covered warehouse Can be directly stacked on the floor (under the sting wood), the small steel can also be stacked on the shelf, heap and heap should be left between the aisle 3 Piled wood placed every 5-6 layers, the spacing does not cause significant bending deformation of steel is appropriate Leng wood to be aligned up and down, in the same vertical plane 4 To increase the stability of the stacking of steel, the steel can be linked to each other, or take other measures In this way, the stacking height of the steel can be twice the width of the heap; otherwise, the height of the steel stack should not be greater than its width 5 A pile of the upper and lower adjacent steel must be staggered before and after So as to fix the sign and number at its end The label shall indicate the specification, steel number, quantity and material acceptance certificate number of the steel and shall be painted with different colors according to its steel grade at the end of the steel 6 Steel plate should be checked regularly Selection of steel, the order to find, not allowed to turn over 7 Consider that the material is easy to carry when it is stacked, leaving a certain width of the channel between the hoppers for transport Reinforcement and forming of steel piling sites must be dry, generally put up with pillow mats stacked on the ground 20CM overhead facilities 8 Sand and other bulk piles built, the rods pole set up from the stack, the template, scaffolding stacking height of not more than 2 meters 9 Brick Masonry placed in the formation of the ground, to prevent tilt, height of not more than 2 meters
Saving land, but also to facilitate the extraction of steel