What is the quota of the integrated power supply cabinet for the outdoor installation of communication equipment?
Far field optical cable pigtail, is the main device of the base station to the tower amplifier, 7/8 feeder instead of 2G equipment.Fixed TSW1-037 outdoor unit: ten meters to soft fiber, for 1 days. It is divided by the total length of 10 meters of cable field, multiplied by 1 days.
The 3G device uses fiber optics to zoom in on the tower. The tower requires an amplifier on the tower, and the base station main equipment is connected to the tower amplifier via field optical fiber cable. The tower amplifier is an active device that requires remote power supply.The communication power supply equipment shall connect the power line to the lightning protection box in the computer room, and then connect the 2 core cable to the tower top amplifier from the lightning protection box. The tower amplifier is called the near end, and the lightning box is called the far end.Fixed TSW1-065 install lightning protection box (indoor installation unit): Set 2 daysApply a fixed installation of TSW2-072 radio remote unit (tower installation unit): Set 4 daysApply a fixed parameter TSW1-045 outdoor laying power cable (dual core) - 16mm, unit: 10 meters, 0.315 days
In the installation of outdoor integrated power supply cabinet using TSD1-049 battery installation screen unit: Taiwan, 1.9 daysThere are notes on the page: install the combination feed screen and install the battery screen rating.Battery cabinet installation screen using TSD1-050~053 battery (xxxAH), unit components, 0.28~0.45 daysTSD1-054 screen in the battery charge and discharge unit: 33 days group.So install the cabinets and batteries are separated here!