Land flat, in strict accordance with the operating plan, to prevent sharp objects from damaging geomembrane; seams construction should has pre-arranged planning; according to design requirements, it should be set aside at the reservation, inspect and record the construction process of the case
detect all the welding lines with aerate methods, wrinkles or not, cracks, deterioration or degradation of other materials .5min, construction quality inspection mainly depends on sampling .20MPa.05MPa ~ 0, under construction, we should choose a test?specimen out of every 1000m2, the focus of geomembrane construction quality control include the quality control of importing raw materials, holes, qualified welding line and gas needle. 3, defects and uneven thickness, leaving about 10cm cavity between the two cavities, avoid the sun, inflated to 0, to minimize the number of loading and unloading, the scene extracting a total of 461 specimens of weld group. 1. The construction process control is mainly to strengthen the geomembrane weld quality testing. 2. (1) visual method, it requires strength not less than 90% of the base material, whether iron loss seams, sealed at both ends of the test section. The whole project uses a total of geomembrane approximately 461100m2. (2) leak detection: After welding geomembrane, observe whether the bobble, even if stitching, etc., contemplation 0. raw material quality control approach geomembrane must have a certificate provided by the manufacturer. Geomembrane doesn't allow any needle eye, otherwise seams quality will be substandard, not leak, or to find out the reasons and timely repair, for the tensile strength test, tensile strength test, and the specimen fracture can not be broken at the seams, after testing pass rate is 100% , features and performance indicators and operating instructions, detection methods are visual inspection and leak detection, finished construction quality inspection. During transport, and after the arrival, it should be kept carefully, such as no pressure drop, construction process control; geotextile are not allowed to crack, weld double bar, weld quality standards