What should be done before decorating the house?
Make a realistic budget based on the material, price and construction details you know, and don't forget the loss in construction (usually around 5%)1 、 hydropower budget (water supply and drainage pipe and pipe fittings, strong and weak wire, threading pipe and pipe fittings, water and electricity installation fee)2. Budget of ground works (tiles, floors, etc.)3. Ceiling project budget4, wall works budget (wall paint, wallpaper, etc.)
1, housing layout: according to their own understanding of the functional areas of the house, like the style of design. During this period, many of the building materials market, to understand a variety of materials, such as tiles, plates, paint and so on. After you have a thorough discussion, draw a floor plan and a plan. According to the plan, find a batted, ideal solution.2. Construction drawing: draw construction drawings with dimensions, such as decorative wall, furniture and so on.