When the tower crane top height is more than meters
Three, lifting and installation, demolition works(1) lifting projects with unconventional lifting equipment and methods with single lifting weights of 100kN and above.
Circular of the Ministry of housing, urban and rural construction on Issuing the measures for the safety administration of sub hazardous and sub divisional projectsAnnex No. [2009]87 [Annex two]"More than a certain size of the risk of larger sub sub project scope."
(two) lifting equipment installation with lifting weight 300kN and above; demolition work of climbing crane within height 200m and above.The installation and disassembly of the tower crane in accordance with the provisions of the above provisions shall be verified by the expert panel.