Bathroom cabinet, such as hanging type requirements clear wall is the load bearing wall?
Wall-mounted (hanging) bathroom main cabinet installation steps: first check the wall whether the real core (otherwise switch to floor type), according to the selected hole, with the impact of drilling holes in the wall (installed on the ground from the ground 83cm), the wall accessories in the plug into the hole, and then self-tapping screws to lock the cabinet and cover, can also be installed with expansion screws. After the installation of the cabinet is complete, then the countertops are aligned with the chessboard.
Wall-mounted bathroom floor cabinet and hanging cabinet installed wall requirements whether the load-bearing walls. In the designer's measurement, if found to have no installation conditions, the customer according to the designer requirements, the appropriate reinforcement of the wall.