Question:

Container track gantry crane how to change the crane hanging steel?

Container track gantry crane how to change the crane hanging steel?

Answer:

In order to meet the transport needs of the port, the crane has a higher level of work.
Container gantry crane and container trailer compared to its span and mast on both sides of the height are larger.
Can be stacked 3 to 4 layers, 6 rows of containers of the yard, the general use of tires, but also useful track.
The trailer will carry the bridge container from the ship to the container rail gantry unloaded to the yard or rear, by the container gantry crane stacking or direct loading and unloading, can speed up the container carrying bridge or other crane turnover.
The lifting speed is 8 to 10 m / min; the span is determined by the number of containers that need to be crossed up to a maximum of about 60 meters corresponding to 20 feet, 30 feet, 40 feet long container weight of about 20 tons, 25 tons