Home > categories > Machinery & Equipment > Edge Banding Series > Do the overall wardrobe, piecework wages can count to how many square meters, blanking, edge banding, drilling, all the procedures should be considered?
Question:

Do the overall wardrobe, piecework wages can count to how many square meters, blanking, edge banding, drilling, all the procedures should be considered?

Do the overall wardrobe, piecework wages can count to how many square meters, blanking, edge banding, drilling, all the procedures should be considered?

Answer:

Probably the total labor cost is 380 yuan per square meter. The material is at 140 yuan per flat
You can use the software to solve Oh, Hongguang wardrobe software you can draw a three-dimensional renderings in about 20 minutes, then according to the actual scheme, can be a key to generate the CAD size map, quotation, material etc..
The minimum material should be opened 12 yuan, or else no one to help you do, the next is critical, the master of the process is not in place, the waste of relatively large plate, so good master, the money is also more expensive.As for the edge, about 8 yuanRow hole, 7 yuanTrial assembly: 22-25 yuan / flatInstallation: 32-35 yuan / flatThe total cost will be around 80-90 yuan per square meter
The minimum material should be opened 12 yuan, or else no one to help you do, the next is critical, the master of the process is not in place, the waste of relatively large plate, so good master, the money is also more expensive.As for the edge, about 8 yuanRow hole, 7 yuanTrial assembly: 22-25 yuan / flatInstallation: 32-35 yuan / flatThe total cost will be around 80-90 yuan per square meterThe above is for reference only:

Share to: