How to fit the cloth rod of the distributor?
Place the distributing rod and its counterweight, and request that the center of the cloth pole must be 200~300mm overhead. The sleepers or wooden side will be set under the feet to see whether the cloth pole body is straight
Build a frame with a cloth pole for bearing and inspect and check the bearing capacity of the stressed part, the reinforcement condition of the double fasteners and the stability of the foundation
Check whether the bolts of the rod are fully tightened and whether the shaft is normal
With the cable wind rope cloth rod fixed legs, cable wind rope not too tight, the interval should be set aside cloth rod deformation.
When the cloth rod is placed on the frame, the leg is compacted by a support pipe, and the device is not necessary when being arranged on the floor of the building