Two sewage pumps switch from each other, start with float switch control, the first sump, when the water is full, the first start, the second rotation to second units start, so the cycle of alternating
Can add time delay relay, the key depends on how much time the water is full, if you design is automatic, it is better to use the triode reliable,
Do you mean that 2 pumps are used in a hole? With float switch control, plus time relay 24 hours, every 12 hours at will, you set time, seconds, minutes can be
The puddle is full, the float switch is closed, and the relay J1 works to drive the first motor. The J1's work makes the intermediate relay 'J' work and locks itself, preparing for the work of the second machines. The water level is lowered to the required minimum position, the ball is broken, the motor is stopped and the motor is stopped. When the water level rose to the highest position again, the floating ball closed again, the relay J2 and self-locking relay J2 to drive second motors, instant intermediate relay are opened, when the water level again be reduced to the lowest position, float off, the motor stops working, stop by working in front of the intermediate relay. The whole circuit back to the original state. So that the two motors work alternately.It should be noted that the circuit diagram for simple to understand, only painted the control circuit, there is no main circuit, there is no missing phase, leakage, over-current and other protection, the actual installation needs to be installed. There is the role of time relay is to ensure that the relay J2 normal work, the intermediate relay is disconnected, so that the motor 2 does not occur wrong action, time relay can be set to a few seconds, or even less than a second. Intermediate relay can also be controlled by time relay, and its time is also set very small, so as to avoid J2 short time possible power supply.