Home > categories > Construction & Real Estate > Steel Frame Formwork > Frame structure calculation of the material, the template area, and how to calculate the square
Question:

Frame structure calculation of the material, the template area, and how to calculate the square

Frame structure calculation of the material, the template area, and how to calculate the amount of wood, steel, fasteners, there is no common factor ratio? The column spacing of 6000

Answer:

(two) the construction of the deployment of 1 construction organization, according to the characteristics of this project, the company decided to set up a clever and capable project manager, construction team during the fight in the diversion project construction, and key projects included in the company's 2003 annual, as the focus to ensure in human, financial and material. The tree image, a brand, and always will be the quality, schedule, safety thread throughout the construction process, to ensure the realization of the goal. (1) the project decision-making level, composed of the project manager, deputy manager, technical director of the project exercise, organization, coordination, control, supervision and command functions. The project manager shall be entrusted by the legal representative, and shall be responsible for the execution and completion of the contents of the contract agreement signed by the company and the owner, in charge of the financial and personnel arrangements
A construction plan (a) overview of the project 1, the basic situation: Yueyang golden sun bridge building materials market Elu Construction Investment Co. Ltd (a) engineering design by the Hunan international engineering consulting and design company, located in Yueyang Avenue on the North side. By field investigation that the project "three connections and one leveling" has been completed, with operating conditions. 2, architectural design: the total length of the project 41.9m, the total width of 25.79m. A total of three layers, are shopping malls, the floors are 4.50M, the highest point of 22.4m. 3, building decoration: (1) the bottom door glass doors and windows: spring door, window for steel sliding window. (2) ground: cement mortar. (3) ceiling: all ceiling cement, cement mortar, lime, white. (4) inner wall: the inner wall is made of mixed mortar, and the surface layer is white. (5) exterior wall: exterior wall is the wall of external wall. 4, the construction of the roof: the roof of this project waterproof coiled material waterproof. 5, engineering structure: (1) the earthquake fortification intensity of the project is 7 degrees. Normal service life of 50 years. (2) the foundation of this project is independent column foundation. (3) the project is frame structure, the beam and column plate are cast in place. The foundation cushion uses the C10 concrete, the foundation uses the C30 concrete, the beam column uses the C25 concrete, the cast-in-place board uses the C20 concrete
I do not quite understand this knowledge on the Internet to help you find some. See if you can use it

Share to: