(1) For where need to install a soft place, to fix the PVC bracket supports (The support materials can be wood, aluminum alloy, stainless steel or other). 2 Then the PVC keel corner horse nail or nail fixed on the support, and then Darphin special in the knife to cut the film is fixed on the PVC keel bracket
1. According to the design requirements of the drawings, in where is needed the installation of soft film smallpox height level Four around a fixed ring 4X4Cm keel support (wood or steel). (see construction design drawing). Note: some areas are relatively large that it requires to install the sub block so as to achieve good effect. This is required to add a wood beam in the central. This is to make a process according to the actual situation. 2. When all the required wooden blade fixed, then to install the aluminium alloy keel to fix the bottom of soft film smallpox.
A soft film ceiling installation should be completed with the coordination of the construction to ensure the quality and time. 1. Before the entering of soft film smallpox the site should be energized and without building waste. 2. The deal with the bottom of the piamater ceiling should be fit for the installation conditions, such as the installation of the steel and so on; it must be cleaned. 3. All the installation of the lights must be according to the requirement of us. We should ensure all of the circuit to be electrified. If there are any lamp not lighting up before installing the soft film, it should be adjusted and repaced in time. The interior hidden lights should be painted with white paints so as to get a better effect. 4. The air conditioning and fire pipes must be arranged in advance and debug to keep it operating well. After the installation of the air inlet, spray head, and smoke sensor, all of them should meet the requirements of us. 5. After the installation of the piamater ceiling is completed, for example, the paint should repair the gypsum board and should not touch the soft film smallpox.
A soft film ceiling installation should be completed with the coordination of the construction to ensure the quality and time. 1. Before the entering of soft film smallpox the site should be energized and without building waste. 2. The deal with the bottom of the piamater ceiling should be fit for the installation conditions, such as the installation of the steel and so on; it must be cleaned. 3. All the installation of the lights must be according to the requirement of us. We should ensure all of the circuit to be electrified. If there are any lamp not lighting up before installing the soft film, it should be adjusted and repaced in time. The interior hidden lights should be painted with white paints so as to get a better effect. 4. The air conditioning and fire pipes must be arranged in advance and debug to keep it operating well. After the installation of the air inlet, spray head, and smoke sensor, all of them should meet the requirements of us. 5. After the installation of the piamater ceiling is completed, for example, the paint should repair the gypsum board and should not touch the soft film smallpox.