Porous plastic couplings for the weak monitoring system in what the quota items?
The quota is prepared with the national or local application effect, or according to local material price and the development of material price standard, according to the different construction methods, construction technology, there will be more detailed distinction. The latest quota of Henan province quota is published in 2013, in order to adapt to the new valuation method of construction project ---- bill of quantities pricing.
If the pipe is laid, the way to care for laying. Is it clear or dark? Is it in the ceiling or buried? If it is buried in the laying, but also directly buried laying and concrete sealing and other forms.If the pipe line, along the laying of outdoor pipes and indoor ceiling, such as laying the corresponding quota is also different.The question is more detailed, or else it is not good to answer directly
Calculate the engineering quantity, according to the distinction between construction methods and technology, can find the corresponding item in the quota, get the corresponding price, multiplied by the calculated quantities, finally obtains the total price. This process is called "set quota"".
If it is outdoor can set the quota items in the chapter outdoor plastic pipe, if the floor is in the plastic pipe can set the quota items buried.