Question:

Antiseptic wood ceiling installation steps? Antiseptic wood ceiling to pay attention to what

Antiseptic wood ceiling installation steps? Antiseptic wood ceiling to pay attention to what

Answer:

4, in the construction of the terrace as far as possible to use long planks to reduce the joints, in order to beautiful; between the board to stay 5mm-1mm gap. 5, all connections should be used galvanized connectors or stainless steel connectors and metal products to corrosion, absolutely can not use different metal parts, or will soon rust, so that the wood structure is fundamentally damaged. 6, in the production and perforation process, should first drill with a drill, and then fixed with screws, so as not to cause artificial cracking. 7, although the treated wood can be anti-bacterial, mildew and termite erosion, but we still recommend you after the completion of the project, until the wood dry or air-dried on its surface using wood protective paint to brush. The use of outdoor wood special paint should pay attention to the first to fully shake, after finishing 24 hours sunny conditions, so that the film in the wood surface film.
Antiseptic wood ceiling installation should pay attention to what aspects of maintenance: 1, outdoor wood should be dry in the outdoors to the outside world with the same degree of humidity and then the construction of the same degree. The use of large water content of the installation of the installation of wood will be a greater deformation and cracking. 2, at the construction site, anti-corrosion wood should be stored in the air, should be avoided as much as possible sun exposure. 3, at the construction site, should be used as far as possible the existing size of anti-corrosion wood, for on-site processing, should use the appropriate preservatives to brush all the incision and holes to ensure the life of preservative wood.
Antiseptic wood ceiling decoration steps: 1, using a stud discoverer located in the ceiling keel. The joists are marked with a pencil and catch each line with a chalk line. This will make the joist easy to see the location. As long as possible, the board is mounted on the ceiling keel vertically. This will make the antique wood ceiling stronger. 2, the upper limit of the measured length. This will help you how long each of your ceilings are needed to give you a good idea. As you use the tongue and groove of the antiseptic wood, you will need to cut the cliff from the side will be docked on the wall of the tongue. Cut the ends of the antiseptic wood using a miter saw. 3, the structure of the bead adhesive applied to the back of the first to install the anti-corrosion wood. Standing on the ladder, the anti-corrosion board pushed to the side of the wall. Carefully pull the antiseptic wood down and then push it up in place. This will help the structural binder spread evenly to the back of the cliff. Use pneumatic nail anti-corrosion wood nail into a ceiling keel. 4, in the same way that you install the first antiseptic wood, install all the planks. However, with continuous wood, you need to make sure you put your tongue into the trough. This will strengthen the board. Just as you come to the fixtures and ceilings to measure and mark the wood, and use a jig to cut the size of the antiseptic wood ceiling. 5, measure and cut the last line of anti-corrosion wood. Most likely in the last line of wood less than the entire board. Measure the size of the board and tear it on the wooden table to see. You will need to cut the bottom of the lips from the upper plate so that the final antiseptic wood is easy to drop even in a small space.